Getting started · 6 months · 1 pump Let’s start
with your pump.
You bring a specific operational question; we bring the measurement equipment and the time for the analysis.
- 6 months
- analysed together
- 1 pump
- in a non-hazardous area confirmed by the operator
How getting started works
-
Preparation
Site survey, installation during an agreed shutdown, test run
-
Start
Joint acceptance
Monthly review
-
Month 03
Interim review: assess observations, sharpen goals
-
Month 06
Final review meeting: assess results, agree next steps
The six months begin with the joint acceptance.
Our goal: fewer unplanned stoppages and more targeted inspections. How much of this can be achieved at your plant is something we measure together – month by month.
Your operational question
For example
- Bearings or joints fail sooner than expected.
- A centrifugal pump often runs far from its best efficiency point.
Operator or service partner: you have a direct line to us in Delmenhorst – from installation to analysis.
What you provide
You provide:
- power supply at the installation site
- network access or LTE reception
- mounting points
- a speed signal if required
- a shutdown window
- a contact person
Framework and terms
One pump in a non-hazardous area confirmed by the operator, outside potentially explosive atmospheres. Scope, installation, support and terms are agreed individually – for getting started and beyond.
Terms on request.
Arrange an introductory call
Tell us in an introductory call of about 20 minutes which pump is on your mind. We clarify the process, installation, IT and terms – and decide together whether OtterFlow suits your plant.
Product preview with synthetic sample data