Getting started · 6 months · 1 pump Let’s start
with your pump.

You bring a specific operational question; we bring the measurement equipment and the time for the analysis.

6 months
analysed together
1 pump
in a non-hazardous area confirmed by the operator

How getting started works

  1. Preparation

    Site survey, installation during an agreed shutdown, test run

  2. Start

    Joint acceptance

    Monthly review

  3. Month 03

    Interim review: assess observations, sharpen goals

  4. Month 06

    Final review meeting: assess results, agree next steps

Getting started over six months.

The six months begin with the joint acceptance.

Our goal: fewer unplanned stoppages and more targeted inspections. How much of this can be achieved at your plant is something we measure together – month by month.

Your operational question

For example

  • Bearings or joints fail sooner than expected.
  • A centrifugal pump often runs far from its best efficiency point.

Operator or service partner: you have a direct line to us in Delmenhorst – from installation to analysis.

What you provide

You provide:

  • power supply at the installation site
  • network access or LTE reception
  • mounting points
  • a speed signal if required
  • a shutdown window
  • a contact person

Framework and terms

One pump in a non-hazardous area confirmed by the operator, outside potentially explosive atmospheres. Scope, installation, support and terms are agreed individually – for getting started and beyond.

Terms on request.

Arrange an introductory call

Tell us in an introductory call of about 20 minutes which pump is on your mind. We clarify the process, installation, IT and terms – and decide together whether OtterFlow suits your plant.

+49 4221 964 99 99

info@otterflow.eu

Product preview with synthetic sample data